In "Configure staffing", the shrinkage field refers specifically to time lost during scheduled productive periods, not total shift shrinkage (which would include breaks, PTO, meetings, training, etc.). The tooltip communicates this correctly, but the industry-standard definition of shrinkage typically implies total lost time across a shift.