Ability to leave description of event in Optimization rules
R
Ready Raccoon
For training specifically, it would be great to have the option to leave a Description (similar to when editing/adding an event in the timeline) for a rule. That way it can be reflected on associate schedules so they know what training they should be working on during the scheduled time.